54 MW 2020 Siemens Biomass Steam Turbine Power Plant 60 Hz

54 MW 2020 Siemens Biomass Steam Turbine Power Plant 60 Hz
or
Call +971 58 54 28028
Description
Low-hour 54 MW Siemens steam turbine generator from a biomass power plant in Japan. Built 2020, in service from 2022 until the plant stopped in 2024. Two-casing reheat turbine with main and reheat steam at 540 °C (12.9 / 3.25 MPa), driving an air-cooled Siemens SGen6-100A-2P generator rated 60,555 kVA at 13.8 kV, 60 Hz. Offered as a complete steam turbine power plant without the boiler, which was built for coal and wood-pellet co-firing and cannot be reused. A new boiler for your fuel can be sourced. FOB Japanese port. Equipment list and running hours on request; inspection after NDA.
Specifications
| Manufacturer | Siemens |
| Model | SGen6-100A-2P |
| Year | 2020 |
| Condition | Used |
| Stock Number | 00076 |
| Frequency | 60 Hz |
| Fuel Type | Biomass |
| Megawatts | 54 |
| Turbine Type | 2-casing reheat |
| Generator Voltage | 13.8 kV |
| Generator Rating | 60,555 kVA, PF 0.9 |
| Main Steam | 12.9 MPa / 540 °C |
| Operating History | Commissioned 2022, stopped 2024 |
| Boiler | Not included |
| Generator Model | Siemens SGen6-100A-2P |
| Generator Weight | 105.9 t total (rotor 18.3 t) |























