54 MW 2020 Siemens Biomass Steam Turbine Power Plant 60 Hz

54 MW 2020 Siemens Biomass Steam Turbine Power Plant 60 Hz

Description

Low-hour 54 MW Siemens steam turbine generator from a biomass power plant in Japan. Built 2020, in service from 2022 until the plant stopped in 2024. Two-casing reheat turbine with main and reheat steam at 540 °C (12.9 / 3.25 MPa), driving an air-cooled Siemens SGen6-100A-2P generator rated 60,555 kVA at 13.8 kV, 60 Hz. Offered as a complete steam turbine power plant without the boiler, which was built for coal and wood-pellet co-firing and cannot be reused. A new boiler for your fuel can be sourced. FOB Japanese port. Equipment list and running hours on request; inspection after NDA.

Specifications

ManufacturerSiemens
ModelSGen6-100A-2P
Year2020
ConditionUsed
Stock Number00076
Frequency60 Hz
Fuel TypeBiomass
Megawatts54
Turbine Type2-casing reheat
Generator Voltage13.8 kV
Generator Rating60,555 kVA, PF 0.9
Main Steam12.9 MPa / 540 °C
Operating HistoryCommissioned 2022, stopped 2024
BoilerNot included
Generator ModelSiemens SGen6-100A-2P
Generator Weight105.9 t total (rotor 18.3 t)